News

Malaysia Rapid Transit Corp Sdn Bhd (MRT Corp) has announced that the Final Railway Scheme for the MRT3 Circle Line has been formally approved and signed by Transport Minister Anthony Loke.
The Metro Rail Transit Line 3 (MRT-3) is now accepting cashless payments at certain station turnstiles, with no need to ...
MRT3 is designed to serve as the final link in the Klang Valley MRT system, connecting major rail lines into a cohesive network. The line will support up to 25,000 passengers per hour per direction. A ...
Via ten interchange stations, the Circle Line will be linked to existing MRT, Light Rail Transit, KTM Komuter, and monorail lines. In March last year, Malaysia paid around $76.3m (S$102.8m) to ...
According to MRT Corp, several improvements have been made to the placement of stations and viaducts along the project’s alignment, as well as to the design of the MRT3 Circle Line’s rail system. In ...