News

As covered in my previous blog post, all diesel-powered generators should be loaded to at least 30% of their standby nameplate rating when exercised during their monthly test. If the connected load ...
Thermon Group Holdings has launched two new load banks to simulate liquid-cooled power and heat requirements.
AUSTIN, TX / ACCESS Newswire / July 29, 2025 / Thermon Group Holdings, Inc. (NYSE:THR) (“Thermon”), a global leader in ...
HOUSTON, Aug. 21, 2017 /PRNewswire/ -- Power Temp Systems, Inc. today announced the launch of their newly developed Generator Load Bank/Distribution Combo Unit. This new product takes the three ...
The combined Asco Froment load bank (resistive/inductive) with Sigma load control and instrumentation hardware, allows for fully variable power factor loading and can test generators up to 800 kVA ...
Generators up to 10 kW can be loaded to full capacity Combines two load banks in one, providing a 0-90A (0-10,800 watt) load at 120V or 0-45A (0-10,800 watt) load at 240V ...
The ILMS option automatically adjusts the engine and exhaust temperature with supplemental heat to ensure the generator operates at full capacity, regardless of load demands. According to Doosan, this ...