News
The boiling water reactor can provide 300 MWe to the grid, and its refueling cycle can extend from 12 to 24 months. It has a design life of 60 years.
Domestic nuclear power can be expanded with small modular reactors (SMRs), increasing the security and flexibility of ...
The new technology could be incorporated into existing reactor designs using the same non-core components of traditional GE-Hitachi boiling water reactors (BWRs).
When constructed, each reactor will provide enough electricity to power 300,000 Toronto homes, at 10% the size and complexity of a traditional boiling water reactor, according to GE Vernova.
General Electric (GE) has submitted its Economic Simplified Boiling Water Reactor (ESBWR) for inclusion on a shortlist for approval in the UK. The country is facing the shutdown of its reactor fleet, ...
Unit 1 is a boiling water reactor that generates 622 megawatts. It’s licensed through 2029. Its sister reactor, Unit 2, is the state’s largest with a capacity of 1,400 megawatts.
"The restart of Onagawa Nuclear Power Plant Unit 2 will be the first restart of a boiling water reactor damaged in the Great East Japan Earthquake. We believe that this will not only contribute to the ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results